The case related to the 28-day period referred to in the Scheme for Construction Contracts (England and Wales) Regulations 1998 Sch.1 para.19(1) for the reaching of an adjudicator’s decision.
(instructed by Collyer Bristow)
Related barrister: Riaz Hussain